|
Title: |
South Orient westbound intermodal |
Description: |
Two South Orient GP7s lead a westbound trailer train on SP trackage over Paisano Pass west of Alpine, Texas on May 22, 1995. From the collection of Wes (Texas Whiskey) Carr, a fellow former San Angelino. At this time, the international bridge at Presidio was still operational, and the manifest was handed off to Ferromez. |
Photo Date: |
5/22/1995 Upload Date: 1/29/2011 9:32:46 PM |
Location: |
Paisano Pass, TX |
Author: |
Wes Carr |
Categories: |
Scenic,Action |
Locomotives: |
SO 101(GP7) SO 103(GP7) |
Views: |
1625 Comments: 3 |
|
|
|
Title: |
Santa Fe's last scheduled run to the Rio Grande |
Description: |
ATSF 1646 West, the last regularly scheduled train from San Angelo, Texas to Presidio, Texas crosses Alamito Creek. This huge trestle (1,206 feet long x 107 feet high) is located about 15 miles north of Presidio and, except for driving down the dry creekbed in a 4WD, in only accessible by rail. Two B23-7s powered this 20-car train, which had a reporter (John Walker) and a photographer (Cadel White) along to document the run. The train crossed the bridge and dropped us off, then backed back out for us to get photos. For two days, we had absolute run of the train, thanks to Trainmaster Roy Williams of Brownwood. |
Photo Date: |
12/20/1990 Upload Date: 1/26/2011 11:32:48 PM |
Location: |
Presidio, TX |
Author: |
John Walker |
Categories: |
Scenic,Bridge |
Locomotives: |
ATSF 6389(B23-7) |
Views: |
2338 Comments: 16 |
|
|
|